Saturday, July 11, 2015

Sorry for not keeping up

Well the weather has been crap since Memorial day.  The river has been up and it has been windy.  I finally got some of the last remaining items completed.  The flybridge is pretty much wrapped up.  I got the cable channel run today.  I finished securing the loose handrails.  Updated with some pictures below and the full list.




  1. Kitchen LED Install
  2. Cut hole for microwave power cable
  3. Finish sink/faucet/counter installation
  4. Add edge strip to the cabinets
    1. Will complete 5/13
  5. Put trim in the rear corners of the salon
    1. Will complete 5/30
  6. Touch up the interior paint
    1. Will complete 5/30
  7. Empty/clean the cuddy
  8. Secure all wires
  9. Secure the toilet pump
  10. Install Carpet
  11. Finish hot water tank switch
  12. Clean the upper salon flooring
  • Engine Bay 
    1. Mount component mounting board
    2. Mount battery charger and outlet
    3. Plumb the generator
    4. Run generator fuel lines and water separator
    5. Reinstall the rudder cutlass
    6. Install remote oil filters for engines
    7. Replace battery charging cables
    8. Replace generator starting battery
  • Driveline
    1. Paint strut
    2. Install rudder packing glands
    3. Install rudders
    4. Install shaft packing glands
    5. Install shafts
    6. Install props
    7. Perform and alignment
  • Exterior
    1. Clean up annodes
    2. Add more bolts to hold the hatch
    3. Seal the deck hardware
      1. Will complete 7/13
    4. Seal kitchen window track
    5. Replace flybridge wall
    6. Fix horn
      1. Will complete 7/12
    7. Clean the exterior carpet
    8. Clean the flybridge
    9. Rivet the loose rails
    10. Add new sticker and hull number
      1. Will complete 7/12
     