Monday, May 4, 2015

Little bit at a time

I spent a few hours at the boat today.  I didn't get everything I accomplished as work came up but I finally got the generator ready to go.  All I need is to add the exhaust hose and muffler and we are is is ready to rock.  I also replaced a pinched part of fuel line on the port engine.  It seemed to act ok, but it was an irritation.  I also replaced the 4 foot piece of fuel line the PO installed because he couldn't find the 1 foot section he needed.  It was one of the things on my list to complete from last year.  I also took the flybridge cable track home and sanded all the carpet glue off.  It just needs cleaned, primed, and painted.  The best news of all is that my new strut came in today and the rudders will be here tomorrow! We are doing alignment tomorrow and I hope to hear about my props soon.  Below is the list:

  1. Interior  (The items below are really some of the last things I plan on doing. They are really the finishing touches to the whole renovation)
    1. Kitchen LED Install
      1. Will complete 5/9
    2. Cut hole for microwave power cable
      1. Will complete 5/9
    3. Finish sink/faucet/counter installation
      1. Will complete 5/9
    4. Add edge strip to the cabinets
      1. Will complete 5/9
    5. Put trim in the rear corners of the salon
      1. Will complete 5/9
    6. Touch up the interior paint
      1. Will complete 5/9
    7. Empty/clean the cuddy
    8. Secure all wires
    9. Secure the toilet pump
    10. Hang Curtain over sink
      1. Will complete 5/9
    11. Install Carpet
      1. Will complete 5/11 (When carpet is due in)
    12. Finish hot water tank switch
      1. Will complete 5/9
    13. Clean the upper salon flooring
      1. Will complete 5/8
  2. Engine Bay 
    1. Mount component mounting board
    2. Mount battery charger and outlet
    3. Plumb the generator
    4. Run generator fuel lines and water separator
    5. Reinstall the rudder cutlass
    6. Install remote oil filters for engines
    7. Replace battery charging cables
      1. Will complete 5/7
    8. Replace generator starting battery
      1. Will complete 5/7
  3. Driveline
    1. Paint strut
      1. Will complete 5/5
    2. Install rudder packing glands
      1. Will complete 5/7
    3. Install rudders
      1. Will complete 5/7
    4. Install shaft packing glands
      1.  Will complete 5/5
    5. Install shafts
      1. Will complete 5/5
    6. Install props
      1. Will complete 5/7
    7. Perform and alignment
      1. Will complete 5/5
  4. Exterior
    1. Clean up annodes
    2. Replaced chipped sink window
    3. Add more bolts to hold the hatch
    4. Seal the deck hardware
      1. Will complete 5/9
    5. Seal kitchen window track
    6. Replace flybridge wall
      1. Started. Old paneling removed.
    7. Fix horn
      1. Will complete 5/9
    8. Clean the exterior carpet
      1. Will complete 5/10
    9. Clean the flybridge
      1. Will complete 5/10
    10. Paint the front roof
      1. Will complete 5/10
    11. Rivet the loose rails
      1. Will complete 5/9
    12. Add new sticker and hull number
      1. Will complete 5/10

No comments: