Sunday, May 17, 2015

Finishing Up

The list is getting really short now.  I was able to get the carpet and most of the kitchen items completed.  I have a few more things to go but it is progressing along.  We plan on getting the generator exhaust ready this week.  We should be 99% finished by this weekend.  I will post pictures a little later.

  1. Kitchen LED Install
  2. Cut hole for microwave power cable
  3. Finish sink/faucet/counter installation
  4. Add edge strip to the cabinets
    1. Will complete 5/13
  5. Put trim in the rear corners of the salon
    1. Will complete 5/13
  6. Touch up the interior paint
    1. Will complete 5/13
  7. Empty/clean the cuddy
  8. Secure all wires
  9. Secure the toilet pump
  10. Hang Curtain over sink
    1. Will complete 5/13
  11. Install Carpet
  12. Finish hot water tank switch
  13. Clean the upper salon flooring
  • Engine Bay 
    1. Mount component mounting board
    2. Mount battery charger and outlet
    3. Plumb the generator
    4. Run generator fuel lines and water separator
    5. Reinstall the rudder cutlass
    6. Install remote oil filters for engines
    7. Replace battery charging cables
      1. Will complete 5/13
    8. Replace generator starting battery
      1. Will complete 5/13
  • Driveline
    1. Paint strut
    2. Install rudder packing glands
    3. Install rudders
    4. Install shaft packing glands
    5. Install shafts
    6. Install props
    7. Perform and alignment
  • Exterior
    1. Clean up annodes
    2. Replaced chipped sink window
    3. Add more bolts to hold the hatch
    4. Seal the deck hardware
      1. Will complete 5/14
    5. Seal kitchen window track
    6. Replace flybridge wall
      1. Started. Old paneling removed.
    7. Fix horn
      1. Will complete 5/14
    8. Clean the exterior carpet
      1. Will complete 5/14
    9. Clean the flybridge
      1. Will complete 5/14
    10. Paint the front roof
      1. Will complete 5/14
    11. Rivet the loose rails
      1. Will complete 5/14
    12. Add new sticker and hull number
      1. Will complete 5/15

    No comments: