Friday, May 29, 2015

A year in the making!

Finally the new generator is in and powering my boat!!!  It took forever to accomplish but I am finally there.  Everything so far has been going well with the boat over the last couple of weeks.   I have had it out a few times and no issues so far.  Here is my list that I am going to complete this weekend.  Even though I still have a few things left to do I can see how people can really get jaded towards their boat after working on it for so long.  If I had issues on launch I think I would have just given up.  After putting so much sweat and money into this thing, I like to think the boat appreciates the new life it was given.  I am finally ready to just enjoy this thing!!!



  1. Kitchen LED Install
  2. Cut hole for microwave power cable
  3. Finish sink/faucet/counter installation
  4. Add edge strip to the cabinets
    1. Will complete 5/13
  5. Put trim in the rear corners of the salon
    1. Will complete 5/30
  6. Touch up the interior paint
    1. Will complete 5/30
  7. Empty/clean the cuddy
  8. Secure all wires
  9. Secure the toilet pump
  10. Install Carpet
  11. Finish hot water tank switch
  12. Clean the upper salon flooring
  • Engine Bay 
    1. Mount component mounting board
    2. Mount battery charger and outlet
    3. Plumb the generator
    4. Run generator fuel lines and water separator
    5. Reinstall the rudder cutlass
    6. Install remote oil filters for engines
    7. Replace battery charging cables
    8. Replace generator starting battery
  • Driveline
    1. Paint strut
    2. Install rudder packing glands
    3. Install rudders
    4. Install shaft packing glands
    5. Install shafts
    6. Install props
    7. Perform and alignment
  • Exterior
    1. Clean up annodes
    2. Replaced chipped sink window
    3. Add more bolts to hold the hatch
    4. Seal the deck hardware
      1. Will complete 5/30
    5. Seal kitchen window track
    6. Replace flybridge wall
      1. Started. Old paneling removed.
    7. Fix horn
      1. Will complete 5/30
    8. Clean the exterior carpet
      1. Will complete 5/29
    9. Clean the flybridge
      1. Will complete 5/29
    10. Paint the front roof
      1. Will complete 6/1
    11. Rivet the loose rails
      1. Will complete 6/1
    12. Add new sticker and hull number
      1. Will complete 6/1